Agilent Technologies 85225F Network Card User Manual


 
63
Agilent 85225F Performance Modeling System
Installation and User’s Guide
Agilent Technologies
2
Installing the System
To prepare the installation site 64
Environmental Requirements 64
Electrical Requirements 64
To receive the system 65
To unpack the shipment crate containing the rack cabinet 66
To verify the shipment 68
To install the work surface 74
To ensure your safety while using the system 76
Precautions for Performing Floating-Ground Measurements 78
Precautions for Avoiding Electrostatic Discharge 79
To connect the bias networks 80
To switch on power to the system 87
This completes the installation process. To confirm the functionality of the
system, continue to Chapter 3, “Verifying System Functionality,”
starting on page 91. 89
Related Topics “Introducing the Agilent 85225F Performance Modeling System" on
page 17
Use this chapter to learn how to first prepare the installation site, and
then receive, unpack, install, and configure the system. This chapter
includes important information on operational safety, as well as
instruction on preparing the installation site, unpacking the system,
ensuring the completeness of the system shipment, installing the work
surface, performing final system configuration, and powering- on the
system.