Agilent Technologies 85225F Network Card User Manual


 
Installing the System 2
Installation and User’s Guide 67
3 Unload the system a Remove the two brace bolts attaching the
side brace assembly to the bottom pallet.
b Remove the side brace assembly.
c Lift the hinged slat and remove the ramp
anchor bolt.
d Place one end of the ramp on the pallet
ramp ledge.
e Insert the ramp anchor bolt and fold down
the hinged slat.
f Fold down the ramp’s end flap.
To secure the ramp, you may place long
wood screws through the ramp and
into the ramp ledge.
g Ensure that the rack cabinet leveling feet
are retracted and that the cabinet casters
are rolling freely.
h Roll the system down the ramp using
extreme care.
i Carefully roll the rack toward its prepared
place within the measurement
environment.
In case the system must be moved in
the future, retain and reuse these
packing materials. You can also
purchase replacement packing
materials from Agilent Technologies.
To unpack the shipment crate containing the rack cabinet (continued)
Step Action Notes
WARNING
A racked system is tall and top-heavy. It is easy to tip the rack
over while moving it, which could result in injury or death.
Unloading the system safely requires the participation of four
persons exercising care so as not to topple the rack cabinet. Do
not stand in front of the rack as it rolls down the ramp.