Alcatel-Lucent 6300-24 Switch User Manual


 
3-2
Installing the Switch
3
Figure 3-1. RJ-45 Connections
Equipment Checklist
After unpacking the switch, check the contents to be sure you have received all the
components. Then, before beginning the installation, be sure you have all other
necessary installation equipment.
Package Contents
Gigabit Ethernet Switch
Four adhesive foot pads
Bracket Mounting Kit containing two brackets and eight screws for attaching the
brackets to the switch
Power Cord—either US, Continental Europe or UK
RS-232 console cable
This Getting Started Guide
• User Guide
Optional Rack-Mounting Equipment
If you plan to rack-mount the switch, be sure to have the following equipment
available:
Four mounting screws for each device you plan to install in a rack—these are not
included
A screwdriver (Phillips or flathead, depending on the type of screws used)
RJ-45 Connector