Alcatel-Lucent 6600 Series Switch User Manual


 
OmniSwitch 6600 Series Chassis and Hardware Components Back Up Power Supply
OmniSwitch 6600 Series Hardware Users Guide April 2004 page 2-23
Blank Cover Panel Requirement
If you are not replacing the back up power supply being removed, be sure to install a blank cover panel
(supplied with your switch) over the empty power supply bay. To install a blank cover panel, follow the
steps below.
1 Place the blank cover panel over the empty power supply bay and insert two Phillips screws (also
supplied with the switch) through the panel and into the threaded holes in the chassis.
2 Once the screws are inserted, fasten the panel to the chassis by tightening the screws. Be sure not to
overtighten the screws.
Viewing Primary and Back Up Power Supply Status
The switch constantly monitors primary and back up power supply operation. If either power supply unex-
pectedly shuts down, the switch sends out a trap to the user and the PS1 and/or PS2 LEDs on the chassis
front panel turn amber.
Note. For detailed LED information, including the PS1 and PS2 LEDs, refer to “Status LEDs” on
page 2-11.
To check the number of power supplies currently operating, and the status of each power supply, use the
show power command. For example:
-> show power
Power Supplies in chassis 8
PS Operational Status
-----+-------------------
PS-1 UP
PS-2 NOT PRESENT
The primary (i.e., factory-installed) power supply is listed as PS-1 in the show power command output.
The back up power supply is listed as PS-2. In the example above, there is no back up power supply
installed in the chassis.
Note. For information on viewing primary and back up power supply status in a stacked configuration,
refer to page 2-24.