Broadband Automatic Disconnect Switch User Manual 5
Installation
Schematic Overview of the Automatic Disconnect Switch System
The user must designate the primary and secondary power supply. Refer to Reset/Test in the Operation section
of this manual for details.
• Automatic Disconnect Switch enclosure
• Two mounting brackets
• Four screws
• One F Connector nut
• UPS literature kit containing:
– product documentation
– safety information warranty information
Primary FRP supplying power
to two buildings
Power
cable
cable
Bulding 1 cable
Bulding 2 cable
FRP1 FRP2
63 VAC
blocking
element
Power
Primary Power Supply
Secondary Power
CS
CS
220 VAC
220 VAC
63 VAC63 VAC
63 VAC
blocking
element
Primary FRP supplying power
to two buildings
Power
cable
cable
Bulding 1 cable
Bulding 2 cable
FRP1 FRP2
63 VAC
blocking
element
Power
Primary Power Supply
Secondary Power
CS
CS
220 VAC
220 VAC
63 VAC63 VAC
63 VAC
blocking
element
Primary FRP supplying power
to two buildings
Power
cable
cable
Bulding 1 cable
Bulding 2 cable
FRP1 FRP2
63 VAC
blocking
element
Power
Primary Power Supply
Secondary Power
CS
CS
220 VAC
220 VAC
63 VAC63 VAC
63 VAC
blocking
element