APC 4000 Power Supply User Manual


 
MGE Galaxy 3000 /
Galaxy 4000 UPS
Application Guide
Identify the Opportunity
> Is battery backup and power conditioning a must?
> Is front access a requirement?
> Is footprint an issue?
> Is scalable power levels important?
> Is a versatile/traditional UPS required?
Customer Challenges
> How to fit today’s budget, and meet the future power
needs of the organization.
> How to increase battery backup in a small footprint.
> How to install and service the equipment when back
access is not an option.
> How to choose when inline and matching
maintenance bypass and distribution are required.
Key Considerations
> 48 hour shipment for SKU’d part numbers
> Ease of installation
Place application
image in this space.
[Product/photo captions Arial 7 point]
Why is APC the right choice for data centers and light
industrial applications?
> Ultra high availability topology (UHAT)
> Compact footprint when space is an issue (internal batteries)
> Internal or external maintenance bypass
> Front access only design
Market trends and opportunities for this space
> Pay as you grow
> Fit the budget you have today
> Meet the future needs of your organization
Target Applications & Environments
> Data center/medical imaging/motor and industrial loads
> Computer or telephone room
> Electrical equipment room
> Service corridor
> Basement