APC SUVTRF30KH Power Supply User Manual


 
990-2821A-001 01/2006
*990-2821*
Smart-UPS
®
VT ISX
Receiving and Unpacking Guide
1
Important Safety Instructions
SAVE THESE INSTRUCTIONS
This guide contains important instructions that should be followed when
handling the UPS.
Symbol introduction
Note
Indicates important information.
Indicates a heavy load that should not be lifted without
assistance.
See also
Indicates that more information is available on this subject in a
different section of this manual.
2
Dimensions and Weights
Dimensions
Shipping weights
See also
Safety Instructions are described in the General Safety sheet
shipped with the UPS (in the documentation storage shelf
behind the front cover).
Note
The UPS has castors making it easy to move to the installation
site. If the UPS needs to moved over a long distance, we
recommend that you use a pallet jack to move the UPS (while
it is still on the pallet).
UPS dimensions in mm
Height 78.4 1992
Depth 43.1 1095
Width 23.6 600
UPS SKU No. Range lbs kg
SUVTRF30KH 400 V 738 335
SUVTRF40KH 400 V 738 335
SUVTRF30KB5H 400 V 738 335
SUVTRF40KB5F 400 V 738 335
SUVTRF20KB5F 208 V 844 383
SUVTRF30KB5F 208 V 844 383
SUVTRF20KB5F 208/208 V 1289 585
SUVTRF30KB5F 208/208 V 1289 585
SUVTRF20KB5G 480/208 V 1289 585
SUVTRF20KB5G 480/208 V 1289 585
SUVTRJ20KB5F 200/208 V 1327 602
SUVTRJ30KB5F 200/208 V 1327 602
Battery Module (consisting of 4 Battery Units). Shipping separately
4 x 52.8 lbs 4 x 24 kg
Smart-UPS® VT and XR Battery Enclosure Receiving and Unpacking Guide
3
Inspection
External inspection
While the shipment is still on the pallet, inspect the shipping material for
any signs of damage or mishandling. Do not attempt to install the system
if damage is apparent. If any damage is noted, file a damage claim with
the shipping agency within 24 hours, and contact APC Technical Support
to inform of the damage claim and the condition of the shipment.
Compare the components of the shipment with the bill of lading. Report
any missing items to the carrier and to APC Customer Support
immediately.
Verify that labelled shipments match the order confirmation.
4
Move to Installation Site
With the system on the pallet, use a pallet jack to move to the installation
site.