Contents
vi
Catalyst GigaStack Gigabit Interface Converter Hardware Installation Guide
78-6460-04
Minimum IOS Release for Redundant Loop Configurations 1-7
Deployment Examples 1-9
Example 1: Cascaded Stack Connection 1-9
Example 2: Point-to-Point Connection 1-10
CHAPTER
2 Installation 2-1
Inspecting the Packing List 2-1
EMC Regulatory Statements 2-2
U.S.A. 2-2
Taiwan 2-2
Japan 2-2
Korea 2-3
Hungary 2-3
Avoiding Electrostatic Discharge 2-4
Installing a GigaStack GBIC 2-4
Attaching the GBIC Clip 2-6
Recommended Configuration 2-7
Connecting to GigaStack GBIC Ports 2-7
Creating Connections 2-8
Point-to-Point Connections 2-10
Cascaded Stack Connections 2-11
Cascaded Stack Connections with a Redundant Link 2-12
Removing a GigaStack GBIC 2-13
Power-On Self-Test 2-14