Gateway 955 Server User Manual


 
44
Chapter 4: Installing Components
www.gateway.com
Preparing to install components
Selecting a place to work
Work on your server in an area that:
Is clean (avoid dusty areas)
Is a low-static environment (avoid carpeted areas)
Has a stable surface on which to set your server
Has enough room to place all of your server parts
Is near a grounded outlet so you can test your server after installation
Is near a telephone (in case you need help from Gateway Technical
Support). The telephone must be directly connected to a telephone jack
and cannot be connected to your server.
Gathering the tools you need
Some tools and supplies that you may need to work on your server are:
A notebook to take notes
A Phillips screwdriver
A small flat-blade screwdriver
Small containers to store various types of screws
A grounding wrist strap (available at most electronic stores)
Getting Help
If you have questions about performing any of these procedures, contact
Gateway Technical Support. For more information, see “Getting Help” on
page 6.