C900 2A90
Starting system jobs
C900 2A95
Abnormal Work Control Block Table cleanup
C900 2AA0
Damage Notification
C900 2AA1
This recovery step either rolls back or completes certain uncompleted
Database operations that were run under Commitment Control
C900 2AA2
This recovery completes certain Journal operations that were in progress
when the system ended processing
C900 2AA3
This recovery sends messages to QHST for Database files that may have
been damaged by a system end
C900 2AA3
This recovery sends messages to QHST for Database files that may have
been damaged by a system end
C900 2AA4
This IPL Status SRC is displayed when SRCs C900 2AA0 - C900 2AA3
have been completed
C900 2AA5
Integrated File System/New File System (NFS) directory recovery
C900 2AAC
Integrated File System conversion
C900 2AB0
Database Recovery part 2
C900 2AC0
Document Library Object (DLO) recovery
C900 2B10
Establish event monitors
C900 2B30
QLUS job
C900 2B40
Device configuration
C900 2C10
After system arbiter
C900 2C20
SNADS recovery
C900 2C25
ZMF component (Mail Enablement (OeDS) Framework) recovery
C900 2C40
Work Control Block Table cleanup
C900 2CF0
Reclaim storage
Chapter 6. System Reference Code (SRC) Information 213