Chapter 5: Management with WebPAM PRO
109
• PDM – Predictive Data Migration
• Synchronization
• Redundancy Check
•Migration
• Transition
• Initialization
• Media Patrol
Making Background Activity Settings
To make settings for background activities:
1. In Tree View, click the Subsystem icon.
2. From the dropdown menu on the Background Activities tab, choose Settings.
3. Click the dropdown menu to choose a priority of Low, Medium, or High for
the following functions:
• Rebuild – Rebuilds the data from a failed drive in a disk array
• Synchronization – Checks the data integrity on disk arrays
• Initialization – Sets all data bits in the logical drive to zero
• Redundancy Check – Checks, reports and can correct data
inconsistencies in logical drives
• Migration – Change RAID level or add physical dries to disk arrays
• PDM – Looks for bad blocks the physical drives of disk arrays
• Transition – Returns a revertible spare drive to spare status
The rates are defined as follows:
• Low – Fewer resources to activity, more to data read/write.
• Medium – Balance of resources to activity and data read/write.
• High – More resources to activity, fewer to data read/write.
4. Highlight the following PDM trigger settings and type a value into the
corresponding field:
• Reassigned Block Threshold – 1 to 512 blocks
• Error Block Threshold – 1 to 1024 blocks
5. Check to enable or uncheck to disable the following functions:
• Media Patrol – Checks the magnetic media on physical drives
• Auto Rebuild – If there is a spare drive of adequate capacity, a critical
disk array will begin to rebuild automatically. If not spare drive is
available, the disk array will begin to rebuild as soon as you replace the