Promise Technology vERSION 0.81 Server User Manual


 
Intel
®
Modular Server Connection Guide
18
This action completes the association of the blade servers in slots 2 through 6
with logical drives LD2 through LD6, respectively.
What to do next
Go back to “Task 2: Enabling External Ports” on page 6 and enable one
more External Port until all the ports have been enabled.