PAGE 5
BEFORE INSTALLATION
Step 1: PREPARING THE CUTOUT
❑ The wall must be flat and vertical.
❑
Make sure that the wall is capable of providing a firm
hold for mounting screws and plugs.
Weight in kg: 24,5.
Preparing the wooden framework
Step 2: PREPARING THE INSTALLATION
There are two mounting methods:
Installation in wooden framework or
Installation with the mounting brackets provided.
– Remove mounting brackets by removing screws
–After removing the mounting brackets, the screws must
be inserted again.
Preparing the installation with mounting
brackets
4 x 1/4" holes