Toshiba A65 Laptop User Manual


 
3.9 Communication 3 Diagnostic Programs
dynabook AX/Satellite AW2/Equium A60/Satellite A60/ Satellite Pro A60 A65 Maintenance Manual 55
Check whether it supports ECP (Extended Capabilities Port) feature.
Subtest 02 IrDA
This test item is divided into Fast IR (FIR) and Slow IR (SIR). FIR supports the
transfer rates of 0.576Mbps, 1.152Mbps and 4.000Mbps; SIR supports the transfer
rates of 2400bps, 4800bps, 9600bps, 19200bps, 38400bps, 57600bps, and 115200bps.
The unit under testing (UUT) is called Slave. It requires a unit whose IrDA works
normally(that is called Master) for transferring data between Slave and Master. Below
is the parameter dialog window of IrDA test.
Connect Timeout: Define the time that slave connecting to master (in seconds);
Test Timeout: Define the time that testing each transfer rate(in seconds);
SIR Test: Choose the transfer rates to be checked in Slow IR;
FIR Test: Choose the transfer rates to be checked in Fast IR.
Below are the operation steps:
? Prepare a Master whose IrDA works normally, then run the test item in
‘Comm/IrMaster’ under Diagnostics menu; the master stays here to wait
for slave requesting.
? Prepare a slave. User should choose the test item ‘Comm/IrSlave’ and set
parameters.
Below is the Slave Testing window.