Chapter 4 Replacement Procedures
Figure 4-11-2 Remove the screws from I/O boards
Installing I/O Boards
The following describes for installing I/O boards.
1. Fix the below screws then incline insert in I/O Boards(CRT board, HDMI board, Audio
board and LAN board)
M2.0x3F FLAT BIND screw x6
M2.0x4F FLAT BIND screw x1
2. Connect the CRT cable, HDMI FFC, Audio FFC, LAN FFC, Speaker cable from I/O
boards’ connectors.
NOTE: Be careful not to catch the cables between top cover assembly and base
assembly.
Satellite T110D / Satellite Pro T110D / PORTEGE T110D Maintenance Manual (960-Q08)
39