18 Site Preparation Guide
Site Preparation
Agilent Technologies is not responsible for:
• Any task not listed in the 5975 Series MSD Troubleshooting and
Maintenance Manual or the installation guides for the GC, data system,
and other accessories
• Installing helium carrier gas or reagent gas tanks and regulators
• Connecting or verifying the performance of hardware and software not
provided by Agilent Technologies
• Connecting the MSD/ChemStation system to the site network
• Testing the MSD against customer standards or samples
• Providing detailed instruction in the operation of the computer operating
system and MSD software
• Setting up laboratory procedures
• Operating the MSD system following installation
NOTE
Items that do not include installation by Agilent Technologies must be installed by the
customer.
NOTE
Contact Agilent Technologies for information concerning training classes.
NOTE
Contact Agilent Technologies for information concerning Application Assist or Chemical
Analysis Consulting services.
5975 Series Site Prep.book Page 18 Thursday, January 31, 2008 9:47 AM