Allied Telesis AT-GS950/48 Switch User Manual


 
Chapter 2: Installation
46
Note
If you plan to configure a redundant data path, insure that the
Spanning Tree feature is enabled via the AT-S106 Management
Software before connecting the ethernet cables.
Powering On the
Switch
To power on the switch, perform the following procedure:
1. Plug the power cord into the AC power connector on the back of the
switch, as shown in Figure 16.
Figure 16. Plugging in the AC Power Cord
2. Plug the other end of the power cord into a wall outlet.
3. Verify that the POWER LED is green. If the LED is OFF, refer to
Chapter 3, “Troubleshooting” on page 49.
Note
The switch is now powered on and ready for network operations. To
start a local management session on the switch, refer to “Starting a
Management Session” on page 47. For more information about
staring a remote management session, see the AT-S106
Management Software User’s Guide.
Warning: Power cord is used as a disconnection device. To de-
energize equipment, disconnect the power cord.
E3
Pluggable Equipment. The socket outlet shall be installed near
the equipment and shall be easily accessible.
E5
100-240VAC~
50-60Hz
1727