APC 208 Vac Power Supply User Manual


 
For further information contact UPS Direct Ltd:
Tel: 08456 445 002 - Fax: 08456 445 003 - Email: info@upsdirect.com - Website: www.upsdirect.com
Smart-UPS 5000 VA 208/230 Vac Tower/Rack-Mount 5U User Manual 3
Install unit in rack
Ensure rack stability prior to installing devices in the rack.
The UPS should be installed at or near the bottom of the rack.
Foam spacers
When installing rails in the rack, install two cage nuts above each rail, (see diagram).
Secure the UPS in the rack using the four cage nuts and eight ornamental screws included in the package.
Install batteries
Second cage nut: count three
holes up from first cage nut
First cage nut: count four holes
up from top edge of rail
Connect only the first two batteries in the string of three batteries. Be sure that the battery
connectors are fully engages.
Do not connect the single battery or the last battery installed in the string of three batteries.
Close and secure battery doors
4x
3 holes
4 holes
3 holes
4 holes