Chapter 2 Installation
Prior to installing the power supply enclosure, a utility breaker box must be installed on the pole.
Utility line voltage must be routed to the enclosure. Local, state, federal and/or National Electric
Code (NEC) regulations regarding location, permits and electrical wiring must be adhered to.
Do not operate the power supply where the temperature and humidity are outside the specified limits.
See Specifications in this manual.
Models Supported
Model Number Description
CTEP0-120 Encl, Pole 0 Batt 20 A, 120 Vac, 60 Hz
CTEP3-120 Encl, Pole 3 Batt 20 A, 120 Vac, 60 Hz
CTEP3-120GI Encl, Pole 3 Batt 20 A, 120 Vac, 60 Hz with Generator Interface
CTEP3-240 Encl, Pole 3 Batt 20 A, 240 Vac, 60 Hz
CTEP4-120 Encl, Pole 4 Batt 20 A, 120 Vac, 60 Hz
CTEP4-120GI Encl, Pole 4 Batt 20 A, 120 Vac, 60 Hz with Generator Interface
CTEP4-240 Encl, Pole 4 Batt 20 A, 240 Vac, 60 Hz
CTEP4-240GI Encl, Pole 4 Batt 20 A, 240 Vac, 60 Hz with Generator Interface
CTEP6-120 Encl, Pole 6 Batt 20 A, 120 Vac, 60 Hz
CTEP6-120GI Encl, Pole 6 Batt, 20 A, 120 Vac, 60 Hz with Generator Interface
CTEP8-120 Encl, Pole 8 Batt 20 A, 120 Vac, 60 Hz
CTEP8-120GI Encl, Pole 8 Batt, 20 A, 120 Vac, 60 Hz with Generator Interface
CTEP8-240 Encl, Pole 8 Batt 20 A, 240 Vac, 60 Hz
CTEP8-240GI Encl, Pole 8 Batt, 20 A, 240 Vac, 60 Hz with Generator Interface
CTEG0-120 Encl, Ground 0 Batt 20 A, 120 Vac, 60 Hz
CTEG3-120 Encl, Ground 3 Batt 20 A, 120 Vac, 60 Hz
CTEG3-240 Encl, Ground 3 Batt 20 A, 240 Vac, 60 Hz
CTEG6-120 Encl, Ground 6 Batt 20 A, 120 Vac, 60 Hz
CTEG6-120GI Encl, Ground 6 Batt, 20 A, 120 Vac, 60 Hz with Generator Interface