Avaya P580 Switch User Manual


 
Appendix A
A-10 Avaya P550R, P580, P880, and P882 Multiservice Switch User Guide, v5.3.1
Web Agent
Procedure
To reset the Active Supervisor to the Standby Supervisor:
1. In the navigation pane, expand the System folder.
2. Select System Reset.
The System Reset Web page is displayed in the content
pane (Figure A-3).
3. Select Yes in response to the question, Do you want to
reset the switch?
CLI Command To reset the switch after downloading new application software, use
the following CLI command:
<configure># reset
For more information on this command, see Chapter 27, “System,”
in the Command Reference Guide for the Avaya P550R, P580, P880, and
P882 Multiservice Switches
Verifying the Upgrade
To verify that the old Active supervisor is now the Standby
supervisor, the LED display window (marquee) should scroll
Standby and the code version.
Upgrading from v4.x to v5.x
If a redundant supervisor module is running a 4.x version of applica-
tion software, it is not upgraded to v5.x if you follow the upgrade
procedure that is described earlier in this appendix.
To upgrade the application software from v4.x to v5.x on a switch
that has a redundant supervisor module, you much upgrade the
application software on each supervisor module individually. To
perform this task:
1. Back up the current software. For information on how to
perform this step, see “Backing Up the Current Software” on
page A-2.
2. Back up the previous configuration. For information on how
to perform this step, see “Backing Up the Previous
Configuration” on page A-3.