Finishing the Installation
Page 3-8
c. Check that the twisted pair connection meets dB loss and cable
specifications outlined Chapter 2.
If a link still has not been established, contact Cabletron Systems
Technical Support.
3.3 Finishing the Installation
The STH is now ready for operation. Before placing the network into
service, test the installation thoroughly, making sure that all stations are
addressable and that the STH and all stations are indicating normal
operation. Confirm that all networking software is configured properly to
match the installed network. If abnormal operation conditions emerge,
proceed to Chapter 4, TROUBLESHOOTING.