![](http://pdfasset.owneriq.net/f/50/f5052b06-5f59-4d2b-b403-1dcf06a8f98a/f5052b06-5f59-4d2b-b403-1dcf06a8f98a-bg35.png)
4-3
Switch Setup
4.3 Electrical Considerations
The following items should be considered when setting up the switch:
CAUTION Consideration should be given to the connec-
tion of the equipment to the supply circuit and
the effect that the overloading of circuits could
have on overcurrent protection and supply
wiring. Appropriate consideration of equip-
ment nameplate ratings should be used when
addressing this concern.
CAUTION Reliable grounding of rack-mounted equip-
ment should be maintained. Particular
attention should be given to supply connec-
tions other than direct connections to the
branch (i.e., use of power strips).