Replacing the Power Supply
Installing the 3000 W AC-Input Power Supply
Caution Use both hands to install and remove power supplies. Each Catalyst 6500 series AC-input power supply
weighs between 22 pounds (9.9 kg) and 28 pounds (12.6 kg).
To install the 3000 W AC-input power supply, follow these steps:
Step 1 Ensure that the system (earth) ground connection has been made. For ground connection instructions,
refer to the installation guide for your hardware platform.
Step 2 Verify that the power switch is in the Off (0) position on the power supply you are installing.
(See Figure 7.)
Figure 7 3000 Watt AC-Input Power Supply Front Panel
Step 3
Grasp the power supply handle with one hand. Place your other hand underneath the power supply, as
shown in Figure 8. Slide the power supply into the power supply bay. Make sure that the power supply
is fully seated in the bay.
INPUT
OK
FAN
OK
OUTPUT
FAIL
OUTPUT 42V /17A
42V /17A
OK
I
I
N
S
T
A
L
L
R
U
N
O
110-120V - 15A
200-240V - 15A
60/50HZ
+
105069
Power
switch
Cable
re
tention
device
AC power
connection
Captive installation
screw
Status LEDs (3)
External power
connector cove
r