INDEX
Printed in U.S.A.
Copyright --- ASCO Power Technologies, L.P. 2011
A
accessories, 5–2, 5–5
auxiliary circuits, 1–2
B
battery, 4–2, 5–1
buttons, push, 3–1
bypass time delay, 1–5, 2–1, 3–1
C
cable
lugs, preparation, 1–1
catalog number, cover
cleaning, 3–1
connections
engine control contact, 1–2
line, 1–1
contacts
auxiliary, 1–2
engine control, 1–2
main, 1–3, 3–1
source availability signal, 5–2
control features, 5–1
load disconnect, 5–4
motor load transfer, 5–4
plant exerci ser, 5–1, 5–2, 5–3
controller, 4–1, 4–2
codes, cover
cover removal, 4–2
disconnecting, 3–1
time delay potentiometers, 4–2
D
DIP Switches, 4–1, 4–2, 5–1, 5–2, 5–4
E
electrical operation, 1–5
engine exerciser, 5–1, 5–2, 5–3
engine starting contacts, 1–2
F
features, see control features
frequency, pickup and dropout
settings, 4–1
functional test , 1–3, 1–4, 1–5
G
ground, controller, 1–1
H
handle, maint enance, 1–3
warning, 1–3
harness, 1–2
disconnect plugs, 3–1
HELP
800–800–2726 (ASCO)
customercare@asco.com
I
inphase monitor, 5–4
inspection, 3–1
installation, 1–1
L
labels,
engine starting contacts, 1–2
inputs / outputs, 1–2
rating, cover
lights, 1–4, 5–1
load disconnect feature, 5–4
lubrication, 3–1
M
maintenance, preventive, 3–1
manual load transfer, 3–2
warning, 3–2
manual operation, 1–3
illustration of, warning, 1–3
motorloadtransferfeature,5–4
N
nameplate, cover
O
operation
electrical, 1–5
manual, 1–3
illustration of, 1–3
warning, 1–3
sequence of, 2–1
optional accessories
programmableengineexerciser
& source availability signal
contacts, 5–2, 5–3
serial communication module, 5–5
strip heater, 5–5
P
parts, 3–1
problem, 3–2
programmable engine exerciser, 5–2,
5–3
R
rating label, cover
remote control features, 5–4
bypass transfe r time delay, 5–4
inhibit transfer to emergency, 5–4
remote test, 5–4
remote transfer to emergency, 5–4
replacement parts, 3–1
S
service, call 800–800–2726 (ASCO)
set engine exerciser, 5–1, 5–2, 5–3
settings
changing, 4–1
factory, 4–1
frequency, 4–1
phase, 4–1
time delay, 4–1
voltage, 4–1
source accepted lights, 1–4, 1–5
T
terminal block, 1–2
test, functional, 1–3, 1–4, 1–5
time delay
adjustment, 4–1
gen–set cooldown, 4–1
how to change, 4–2
override momentary outages, 4–1
settings, 4–1
transfer to emergency, 4–1
transfer to normal, 4–1
timer (plant exerciser), how to set,
5–1, 5–2, 5–3
transfer swit ch position lights, 1–4,
1–5
transfer test, 1–5, 3–1
trouble–shooting, 3–2
V
voltage, phase, 4–1
voltage, pickup and dropout settings,
4–1