GenTran R6010 Power Supply User Manual


 
4
Transferring from Generator Power to Utility Power:
1. On the Power Center, turn OFF Generator MAIN breaker and turn ON Utility MAIN breaker. On 200 amps Main breaker models, this will require sliding the
interlock mechanism up with the left hand while turning ON the 200 amp circuit breaker.
2. Turn ON any branch circuit breakers in the Power Center and Main Load center that are OFF.
3. Shut down the generator, following the procedures in the generator Owner’s Manual.
4. Unplug the power cord from the Power Center and then the generator.
5. Let the generator cool down before storing in a dry, secured location.
6. To ensure that your generator will work properly when you need it, it is important to start and run your generator under load regularly and keep the tank
filled with fresh fuel. Perform the above steps at least ONCE A MONTH to keep the generator properly “exercised.”
TABLE 2 - Wire Connector Usage Chart:
WIRE SIZE 12 10 8 6
14
Red NA NA NA
12
Red Red NA NA
10
NA Red NA NA
8
NA NA Blue Blue
6
NA NA Blue Blue
TABLE 3 – Compatible Circuit Breaker Types: Compatible GFCI, Arc-Fault/ Surge Protection Circuit Breakers:
Siemens QP, QT, QPH, HQP, QPF, QPHF, QFP, QE, QEH Siemens: QPF (GFCI), QAF (Arc Fault), QP (Surge Protector)
Cutler Hammer/Westinghouse Series BD, BR, BQ, GFC
Challenger Type A, C, HAGF
Square D Series HOM
GE Series THQL
WIRING DIAGRAMS:
Gen/Tran Corporation
P.O. Box 1001, Alpharetta, GA 30009-1001
Toll Free: 1-888-GEN-TRAN Fax: 770-552-7756
www.gen-tran.com
© 2003 Gen-Tran Corporation. All Rights Reserved. PowerStay is a trademark of Gen-Tran Corporation PN XXXXX Rev A 6-12-03