Havis-Shields DS-PAN-411 Laptop Docking Station User Manual


 
www.havis.com • 1-800-524-9900
1) Tip the Docking Station to a position that is comfortable to work with.
2) Install all cables that are necessary for computing needs.
3) Use Zip Ties (Hardware Kit Item 1) to strain relieve cables at rear of
Docking Station.
IF SECURING EXTERNAL ANTENNAS TO DOCKING STATION (DS-PAN-411-2, DS-PAN-412-2, PKG-DS-PAN-412-2)
LEAVE AN ADEQUATE SERVICE LOOP BETWEEN THE ANTENNA CONNECTOR AND THE FIRST ZIP TIE
ON THE DOCKING STATION TO ENSURE LATCHING AND UNLATCHING MOTION IS NOT RESTRICTED.
4) Gather all cables to one side and tie off to unused holes on underside
of Docking Station.
6 7
Cable Management
Insert as many zip ties as
necessary to secure cables.
2) Lower the Docking Station to the Mounting Bracket as shown and secure
with (4) 1/4”-20 x 5/8” long screws (Hardware Kit Item 3). Torque screws
to 80 in-lbs (9.0 Nm) ± 10%.
1/4”-20 Screws
Installation
1) Remove the Mounting Bracket from the packaging. Install the
Mounting Bracket to the Motion Device using (3) 1/4“-20 x 5/8” long
screws (Hardware Kit Item 3). Torque screws to 80 in-lbs (9.0Nm) ± 10%.
NOTE: Numerous hole patterns present in Mounting Bracket will accomodate Havis Motion
Devices as well as most competitors’
1/4”-20 Screws
Mounting Bracket
Typical Motion Device Example
(not included)
NOTE: We recommend applying a drop of medium strength (blue)
thread locking adhesive to the threads of all fasteners.