HP (Hewlett-Packard) B2B96UT#ABA Personal Computer User Manual


 
3 Setting up the workstation
This chapter describes how to set up your workstation.
Topics
Ensuring proper ventilation on page 14
Setup procedures on page 16
Adding monitors on page 17
Ensuring proper ventilation
Proper ventilation for the system is important for workstation operation. Follow these guidelines:
Operate the workstation on a sturdy, level surface.
Provide at least 15.24 cm (6 inches) of clearance at the front and back of the workstation.
(Workstation models vary.)
Figure 3-1 Proper workstation ventilation
Ensure that the ambient air temperature falls within the environmental specifications listed in this
document.
14 Chapter 3 Setting up the workstation