Working Instruction
Document No. : SOP VV10 FA Station :
Name : Ver. : Date :
STEP:
::
:
Fixture list(Fixture standard)
Qty
Point for attention:
::
:If finding some defects, notice the gaffer and assistant
Fixture list(Fixture standard)
Qty
Tabulator:_Zhang Ying_
Issuing department: IE
1.Disassemble antenna cable
Disassemble antenna cable
(
Fig.13” 14” 15”)
Disassemble antenna cable
24(1/1)
2010/03/080.20
13”
15”
14”