HP (Hewlett-Packard) J8165A Network Router User Manual


 
Planning
Planning
Infrastructure Requirements
Infrastructure Requirements
Air conditioning. Power supplies create a great amount of heat. Ensure you
have enough cool air to maintain an ambient temperature between 0°C to 55°C
(32°F to 131°F) around the switch devices inside the rack.
Power requirements.Ensure you have enough power supplied to the area
where the switches will be mounted. Some units have dual power supplies in
them that you may want to consider connecting each power supply to different
circuits.
Space. These devices may be deeper than other equipment in your network.
Have enough space for the switch and around the switch to allow access and
cool air circulation. If placing in an enclosed rack make certain there is
adequate airflow and cooling through the rack.
Racks. These devices may be heavier than other devices in your network.
Rack heavy devices at the bottom of the rack, followed by lighter devices as
you move up the rack. Secure racks as specified by your rack’s manufacturer.
Ensure your racks are compliant with any earthquake rules.