IBM 990 Server User Manual


 
45
Continuous Availability Recommended Confi guration for
Parallel Sysplex
Note: z990 will attach to 9037-001 or 9037-002. Service for 9037-001
will be discontinued at the end of 2003.
Components and assumptions
Two Coupling Facilities; at least one external or else
using System-Managed CF Structure Duplexing
Two Sysplex Timers
Two z/OS or OS/390 servers with redundant backup
capacity
Two links from each CF to each image
Two hardware management consoles
Two ESCON or FICON Directors with cross-connected
disks
Dual electrical power grids
Cloned OS/390 images, latest available software levels
Automation capabilities for recovery/restart
Critical data on RAID and/or mirrored disks
Key attributes can include
No single point of failure
Fast, automatic recovery
CF: rebuild in surviving CF
CEC, z/OS, OS/390: restart subsystems on surviving
image
TM/DBMS: restart in place
Surviving components absorb new work
No service loss for planned or unplanned outages
Near unlimited, plug-and-play growth capacity
ESCON/FICON Express Channels
z/OSz/OS
Internal Coupling
Facility
Dedicated (External)
Coupling Facility
z900 Model 100
9674, 9672 R06,
or z800 Model 0CF
ICF
IC
z990
with CFs only
Sysplex Timers