IBM PN 26L0451 Network Hardware User Manual


 
 Installation Instructions
3. Shutdown and restart the Service Processor and re-iml the 3746-9x0
10.2 Enabling the NNP Back-up Function
Important
It's a customer task, but ask the customer if he wants you to perform this task.
1. On the 3746-9X0 main menu, Click on Network Node Processor Man-
agement.
2. Double click on Manage Control Point on NNPs.
3. Click on Enable the CP/NNP back-up.
4. Click on Close to exit from the function.
Note: For details refer to chapter Working with the NNP Functions on the
3746-950 User's Guide
, SA33-0356, or the
3745-17A to 61A and 3746-900
Basic Operation Guide
, SA33-0177.
3746 PN 42L2445 EC F52322 EC F12701A EC F70078
FFBM 7 of 10 09 Oct 1998 14 DEC 1998 22 APR 1999
7