Cornelius 569000689 Switch User Manual


 
2
569000338
Page 2 of 2
FCB Countertop Product Plumbing Components
FCB Standing Product Plumbing Components
4
56
8
9
10 11
12
FIGURE 1. PRODUCT PLUMBING COMPONENTS
11. Remove the existing display board for cylinders No. 1 and No. 2. Install new display board, removing pro-
tective coating on lens. Pay special attention to putting the connectors back in the proper location. Repeat
for cylinders No. 3 and No. 4 (if applicable).
12. Turn CO
2
supply back on to syrup pumps. Visually check soldout connections for leaks.
13. Turn main power back on. Set clock, wakeup time sleep time, defrost time(s) and viscosity settings. Turn
barrels to ON and let unit cycle. Draw a couple of drinks from each barrel to verify proper operation.
Double check syrup connection for leak.
14. Disconnect BIB connector from each syrup line (or pinch line closed to simulate soldout condition). Draw a
couple of drinks from each barrel to verify soldout condition occurs. Pay close attention that the correct
barrel soldout is lit to verify wiring integrity. Reconnect BIB connectors and verify that soldouts clear.
15. Replace side, front access and rear panels.
16. Pack circuit boards into the protective packaging from the replacement boards for return to IMI Cornelius.
Scrap flow sensors, syrup inlet lines that were removed and any leftover parts.