IronPort Systems 4500 Series Switch User Manual


 
2-17
Catalyst 4500 Series Switches Installation Guide
78-14409-08
Chapter 2 Preparing for Installation
Site-Planning Checklist
3 Power evaluation:
Input power type
Receptacle proximity to the equipment
Dedicated (separate) circuits for redundant
power supplies
UPS for power failures
4 Grounding evaluation:
Circuit breaker size
5 Cable and interface equipment evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment (transceivers)
6 EMI evaluation:
Distance limitations for signaling
Site wiring
RFI levels
Table 2-2 Site-Planning Checklist (continued)
Task No. Planning Activity Verified by Time Date