Catalyst 4500 Series Switches Installation Guide
78-14409-08
Chapter 2 Preparing for Installation
Site-Planning Checklist
3 Power evaluation:
• Input power type
• Receptacle proximity to the equipment
• Dedicated (separate) circuits for redundant
power supplies
• UPS for power failures
4 Grounding evaluation:
• Circuit breaker size
5 Cable and interface equipment evaluation:
• Cable type
• Connector type
• Cable distance limitations
• Interface equipment (transceivers)
6 EMI evaluation:
• Distance limitations for signaling
• Site wiring
• RFI levels
Table 2-2 Site-Planning Checklist (continued)
Task No. Planning Activity Verified by Time Date