SNMP-NV6
Page 21
5.3.2.4 Outlet Control
Press the Switch Bank button to control the UPS output relay to turn on or off individual
output banks.
5.3.2.5 Power Fail/Restore Simulation
Pressing one of the buttons causes the card to simulate the UPS power fail or power
restore event. Based on this function, we can test all of the connected software to verify
whether they work properly or not. The UPS will remain in its original state and will not go
to the battery mode.
5.3.3 Weekly Schedule
This menu allows you to modify the parameters of the shutdown/restart/test events
associated with the days of the week.