Moxa Technologies EDS-728/828 Switch User Manual


 
5
STEP 2:
Mounting the EDS-728/828 on the wall requires 4 screws to
ensure that the switch does not come loose from the wall.
Use the switch, with wall mounting plates attached, as a
guide to mark the correct locations of the 4 screws. The
heads of the screws should be less than 6.0 mm in diameter,
and the shafts should be less than 3.5 mm in diameter, as
shown in the figure at the right.
6.0 mm
3.5 mm
NOTE
Before tightening the screws into the wall, make sure the screw
head and shank size are suitable by inserting the screw into one of
the keyhole-shaped apertures of the Wall Mounting Plates.
Do not screw the screws in all the way—leave about 2 mm to allow room for
sliding the wall mount panel between the wall and the screws.
STEP 3: Once the screws are fixed in the wall, insert the four screw heads
through the large parts of the keyhole-shaped apertures, and then slide Moxa
EDS downwards, as indicated. Tighten the four screws for added stability.
EtherDevice Switch
EtherDevice Switch
EDS-728/828
EDS-728/828
Uninstalling IM-2G Modules
As shown in the figure below, use a flat-blade screw driver as a lever, and pull
or push it to force the IM-2G module outwards. Then pull the module out away
from the EDS-728/828.