NetComm NP2160 Switch User Manual


 
www.netcomm.com.au Rev.1 - YML623
Page 6 16-port 10/100Mbps Fast Ethernet ProSwitch
UNPACKING AND INSTALLATION
This chapter provides unpacking and setup information for the Switch.
Unpacking
Open the shipping cartons of the Switch and carefully unpacks its contents. The carton should
contain the following items:
One NetComm16-port 10/100Mbps Fast Ethernet ProSwitch
One AC power cord, suitable for your area's electrical power connections
Four rubber feet to be used for shock cushioning
Screws and two mounting brackets
This Guide
If any item is found missing or damaged, please contact your local reseller for replacement.
Installation
The site where you install the Switch stack may greatly affect its performance. When installing,
consider the following pointers:
Install the Switch in a fairly cool and dry place. See Specifications for the acceptable
temperature and humidity operating ranges.
Install the Switch in a site free from strong electromagnetic field generators (such as motors),
vibration, dust, and direct exposure to sunlight.
Leave at least 10cm of space at the front and rear of the hub for ventilation.
Install the Switch on a sturdy, level surface that can support its weight, or in an EIA
standard-size equipment rack. For information on rack installation, see the next section,
Rack Mounting.
When installing the Switch on a level surface, attach the rubber feet to the bottom of each
device. The rubber feet cushion the hub and protect the hub case from scratching.
Rack Mounting
The switch can be mounted in an EIA standard-size, 19-inch rack, which can be placed in a
wiring closet with other equipment. Attach the mounting brackets at the switch's front panel
(one on each side), and secure them with the provided screws.