2-29
v1.0, September 2007
Chapter 2
Installation
This chapter describes the installation procedures for your NETGEAR Smart Switch. Switch
installation involves the following steps:
Step 1: Preparing the Site
Step 2: Installing the Switch
Step 3: Checking the Installation
Step 4: Connecting Devices to the Switch
Step 5: Installing an SFP GBIC Module
Step 6: Applying AC Power
Step 7: Managing the Switch through a Web Browser or the PC Utility for Initial Configuration
Step 1: Preparing the Site
Before installing the switch, ensure the operating environment meets the requirements in the
following table.
Table 2-1. Site Requirements
Characteristics Requirements
Mounting • Desktop installations - Provide a flat table or shelf surface.
• Rack-mount installations - Use a 19-inch (48.3-centimeter) EIA standard equipment
rack that is grounded and physically secure. The rack-mount kit supplied with the switch
is also required.
Access Locate the switch in a position that allows access to the front panel RJ-45 ports, the ability
to view the front panel LEDs, and easy safe access access to the power connector.