Paradyne 7510 DSU Network Card User Manual


 
Testing
5-10
7510-A2-GB20-10
November 1997
Ending an Active Test
A test initiated by the user can be ended by the user.
H A Test Timeout option is available to automatically terminate a user-initiated
Loopback or Pattern test after it has been running a specified period of time.
Refer to Table A-1, System Options.
Test Timeout does not pertain to tests commanded by the:
Network, such as the network-initiated CSU and DSU Loopbacks.
DTE, such as the DTE-initiated Local Loopback.
H On each test screen is a command column. Pressing Return when the cursor
is on the Stop command stops the test.
H Use the Abort All Tests selection from the Test menu to stop all tests running
on all interfaces, with the exception of network or DTE-initiated loopbacks.
Command Complete appears when all tests on all interfaces have been
terminated.