Peerless Industries EXA-S Projector User Manual


 
7 of 11
ISSUED: 1-11-08 SHEET #: 055-9495-2 10-16-08
Visit the Peerless Web Site at www.peerlessmounts.com
For customer care call 1-800-865-2112 or 708-865-8870.
Installing Inner Channel and Routing Cables
3
Note: Be certain holes on inner channel (C) face in the same direction of opening on outer channel (B).
Note: Cables must be removed from projector before routing through channels. If cables are not removable from
projector, routing through channels is not an option.
Guide projector cables into openings in channels then insert inner channel (C) into outer channel (B) as shown in
figure 3.1 or 3.3.
Position inner channel (C) to the desired extended position and secure using two M6 x 12 mm socket pin
screws (K) through clamp plate (D) and into inner channel (C) as shown in figure 3.2 or 3.4.
CEILING INSTALLATION
WALL INSTALLATION
(EXCEPT FOR EXC MODELS)
OPENING
HOLES
B
C
fig. 3.4
fig. 3.3
K
D
B
C
OPENING
B
C
HOLES
GUIDE
CABLES IN
CHANNELS
fig. 3.1
fig. 3.2
K
D
B
C