5
Planning a UPS system should include the following considerations:
• The total demand of the protected system shall dictate the output power rating (VA).
Allow a margin for future expansion or calculation inaccuracies from measuring
power requirements.
• Backup time needed will determine the battery size needed. If the load is less than
the UPS nominal power rating then the actual backup time will be longer.
• The following options are available:
• External Battery Cabinets, and
• Connectivity options (Remote Contact, SNMP/WEB card).
The following UPS models are available.
Model
Backup time Internal
batteries
Recharge time to 90%
capacity
UPS 1000VA 7 min 4 hours
UPS 1500VA 6 min 4 hours
UPS 2000VA 7 min 4 hours
UPS 3000VA 6 min 4 hours
Additional External Battery Cabinets are available if more back-up time is needed.