Transition Networks E-TBT-HB-0802 Switch User Manual


 
LANMaster T8
12
7
8-Port Ethernet Hub w/SIC Slot
3. INSTALLATION
To install the LANMaster T8 Hub:
Unpack the LANMaster T8 Hub.
Install on flat surface.
Connect 10BaseT Cable at Front.
Optionally install Slide-In Cards.
Optionally install Slide-In Card cable.
Connect LANMaster T8 Hub to power.
Direction is provided in the pages that follow.
Unpacking the LANMaster T8
The LANMaster T8 Hub packing contents should include the
following:
Item Part Number
LANMaster T8 E-TBT-HB-0802
Power Cord 3344, 3347, 3348, 3349, or 3523,
(depending upon power configuration
in country where installed)
Users Guide 7364
In addition, any of the following optional SICs may be included:
Item Part Number
Thinnet Coaxial E-CX-SIC
Fiber Optic E-FRL-SIC
Twisted Pair E-TBT-SIC
Female AUI E-AUI-DT-SIC
Male AUI E-AUI-DC-SIC
Bridge E-BR-SIC
Redundant Fiber Optic E-FL/RED-SIC
Female AUI Connector/10Base5 Connection
The female AUI card (E-AUI-DT-SIC)
provides a female AUI connector for
connection, through an AUI drop
cable, to the 10Base5 port on a
transceiver.
The bridge card (E-BR-SIC) also
provides a female AUI connector for
connection, through an AUI drop cable, to the 10Base5 port on a
transceiver. NOTE: The bridge card enables site-configurable filtering of
packets to and from the network backbone.
Male AUI Connector/PC Connection
The male AUI card (E-AUI-DC-SIC)
provides a male AUI connector for
connection, through an AUI drop
cable, to a 10Base5 port on a
powered PC.