4
Installing the Upgrade Kit
To install the 1-GB or 2-GB flash and 1-GB RAM Upgrade Kit in an X90 or X90e mobile
thin client:
Caution
Follow all precautions listed in the Quick-Start Guide that came with your
mobile thin client for disconnecting and reconnecting the mobile thin client.
1. Perform a proper shutdown of the mobile thin client by closing all files and ending your
session, and then press the power button to turn off the mobile thin client.
2. Unplug the power cord and power adapter, and remove any other cables from the
mobile thin client prior to disassembly.
3. Position the mobile thin client face down, and then using a small Phillips screwdriver
remove eight (8) screws from the bottom of the unit as indicated in
Figure 5.
Figure 5 Removing bottom screws from access cover
4. Using a flat edge tool, preferably plastic, insert its tip in the depressed area as shown
in
Figure 6 and carefully lift up the cover to remove.
Figure 6 Lifting off the access cover