A SERVICE OF

logo

AdvancedFrame Expedition™ Inatable Kayak Owner’s Manual
9
Diagram of Ination Chambers
3.3 Inating
IMPORTANT: Before inating, check to be sure that the kayak is completely assembled. Inate
your kayak in the following order. Failure to follow these instructions may cause damage to
yourkayak.Donotoverinate.
1. Partially inate chamber 1 until the kayak begins to ll out or appears to be half way inated
then close cap. Check to be sure the valve is in the inate position (
See Figure 1).
2. Inate chamber 2 until the AdvancedFrame™ tube is rm to touch (2.0 psi ONLY).
3. Inate chamber 3 “oor“ (using appropriate ing). Twist valve open to inate and twist
closed when complete (See Figure 2). Fill until rm. DoNotOver-Inate! (1.0 psi ONLY)
4. Inate Coaming chambers 4 & 5 until rm. Never over-inate! (1.0 psi ONLY)
5. Inate chamber 6 & 7/8 & 9 for desired deck li. Never over-inate! (1.0 psi ONLY)
6. Make sure all valves are closed tightly and properly.
7. Finally, Insert Plastic Bow and Stern forms into pocket on bow and stern (Figure 3).
Figure 3. Plastic Bow and Stern Insert