AdvancedFrame Expedition™ Inatable Kayak Owner’s Manual
9
Diagram of Ination Chambers
3.3 Inating
IMPORTANT: Before inating, check to be sure that the kayak is completely assembled. Inate
your kayak in the following order. Failure to follow these instructions may cause damage to
yourkayak.Donotoverinate.
1. Partially inate chamber 1 until the kayak begins to ll out or appears to be half way inated
then close cap. Check to be sure the valve is in the inate position (
See Figure 1).
2. Inate chamber 2 until the AdvancedFrame™ tube is rm to touch (2.0 psi ONLY).
3. Inate chamber 3 “oor“ (using appropriate ing). Twist valve open to inate and twist
closed when complete (See Figure 2). Fill until rm. DoNotOver-Inate! (1.0 psi ONLY)
4. Inate Coaming chambers 4 & 5 until rm. Never over-inate! (1.0 psi ONLY)
5. Inate chamber 6 & 7/8 & 9 for desired deck li. Never over-inate! (1.0 psi ONLY)
6. Make sure all valves are closed tightly and properly.
7. Finally, Insert Plastic Bow and Stern forms into pocket on bow and stern (Figure 3).
Figure 3. Plastic Bow and Stern Insert