CBP Tank Installation (continued)
8. Plug in the CBP-30 Tank Agitation motor
110v power cord to the 110v female connector on the HCBT
Control Panel.
CBP-30 Tank Power Cord
7. Fill the CBP-30 Tank with Liquid Seed Treatment Product
through the Tank Lid.
NOTE: Read and understand the liquid seed treatment
product label and material safety data sheet (MSDS).
Follow all instructions for use, handling, precautions,
protective equipment and other instructions listed on the
label and the MSDS.
9. Turn the HCBT AGITATOR Switch
to the ON position (light will go ON).
HCBT Pump Control Switches
Tank Lid
10. Turn the PUMP Switch
to MANUAL and HOLD (light will go on) to deliver treatment
product to the treater. This jog switch will reset to OFF
when released.
Installation is complete, you are now ready to test the Pump.