
Index
IN-2
Catalyst 3750 Switch Hardware Installation Guide
OL-6336-07
cabling (continued)
StackWise cables
cable numbers
1-25
connecting to 2-30
cautions viii
5 A-branch-circuit protection C-4
DC-input power source 1-26
DC power C-4
electromagnetic safety 2-4
grounding procedure C-2
installing and removing fiber-optic SFP
modules
2-33
installing and removing fiber-optic XENPAK
modules
2-36
lightning surge requirements C-8
nonexposed wiring connections C-8
PoE faults 1-19, 2-40
removing and installing StackWise cable 2-31
removing dust plugs from fiber-optic SFP
modules
2-34
removing dust plugs from fiber-optic XENPAK
modules
2-36
removing rubber plugs from SFP module 2-42
removing rubber plugs from XENPAK module 2-44
secure terminal block wires C-8
torquing recommendation C-7
using approved cables 1-25
Cisco enhanced power negotiation 1-11
Cisco IOS command-line interface 1-27
Cisco IP Phones, connecting to 1-11, 2-40
Cisco RPS
See RPS
CiscoView
1-27
Class 1 laser warning 2-3, 2-41, 2-44
CLI 1-27
accessing by using Express Setup D-2
accessing through console port D-2
code compliance warning 2-4
command-line interface
See CLI
connecting
to 10/100/1000 ports
2-39
to 10/100 ports 2-39
to console port B-5
to DC power C-1 to C-8
to SFP modules 2-41 to 2-43
to XENPAK modules 2-44 to 2-45
connecting to the console port D-5
connection procedures 2-39 to 2-45
connectors and cables
console port
B-5 to B-10
power (AC and RPS) 1-25
SC connectors B-3
SFP module ports B-3
XENPAK module ports B-4
console port
connecting to
D-5
connectors and cables B-5 to B-10
described 1-27
conventions, document viii
crossover cable
connecting to 1000BASE-T SFP module ports
2-43
pinout
four twisted-pair, 1000BASE-T ports
B-9
four twisted-pair 10/100 ports B-7
D
DC circuit warning C-4
DC-I grounding note 2-4
DC-input power source caution 1-26
DC input voltages for RPS 2300 and RPS 675 A-2 to A-13
DC power
connecting to
C-1 to C-8
RPS 1-3
specifications A-2
warnings C-6
DC power caution C-4