A SERVICE OF

logo

49
Appendices
Procedure
1
Turn off the projector power, wait for the
cool-down
period to end, and then
disconnect the power cable.
The cool-down period lasts for about 20 seconds.
The actual time will vary depending on the
external air temperature.
2
Put your finger into the recess, and pull
straight out to remove the air filter.
3
Install the new air filter.
Slide the cover in from the outside, and then push
it in until it clicks into place.
Replacing the Air Filter
Dispose of used air filters properly in accordance with your local regulations.
Cleaning
Replacing Consumables