A SERVICE OF

logo

FIGURE 8
STEP 8:
0
1
2
345
6
1/2 1/2 1/2 1/2 1/2 1/2
12
• Remove the two temporary 1/2 X 4-1/2” BOLTS (43) from STEP 5.
• Swing the LEFT (8) and RIGHT (9) RAILS out enough to insert the CARRIAGE ASSEMBLY (16) in between them. Allow the
CARRIAGE (16) to rest on the SAFETY STOPS underneath the RAILS. See FIGURE 8.
43 1/2 X 4-1/2”
16
8
9
SAFTEY
STOP