3Com 7000HD Switch User Manual


 
2
32M
B
M
EMORY
U
PGRADE
I
NSTALLATION
ON
THE
C
ORE
B
UILDER
7000HD S
WITCH
M
ODULE
32MB Memory
Upgrade Steps
Step 1 Removing the CoreBuilder 7000HD Switch Module from the
Chassis
Before starting, make sure that you wearing the ESD wrist strap and
that you are properly connected to grounding equipment as
described in “Safety Precautions” on page 1-2.
Disconnect the cables from the module’s ports. Ensure that there is a
record of where the cables are attached so that you can correctly
re-connect them to the module when finished.
With the #1 flathead screwdriver supplied, loosen the two captive
screws located on the far left and right of the module
near the
ejector handles
(Figure 2-1)
.
Do not remove the screws.