Acer P1266P Projector User Manual


 
33
English
Ceiling Mount Installation
If you wish to install the projector using a ceiling mount, please refer to the
steps below:
1 Drill four holes into a solid, structurally sound part of the ceiling, and
secure the mount base.
Note: Screws are not included. Please obtain the appropriate
screws for your type of ceiling.
2 Secure the ceiling rod using the appropriate type of four-cylinder screws.
Ceiling Mount Base
- Attach to ceiling
Screw Type A
50 mm length / 8 mm diameter -
Long Rod
Extension Rod
Long Cylinder Cap
Allen Key
- For tightening/loosen
i
Tightening Screw
Medium Rod
Ceiling Mount Base