December 20, 2004 Chapter 2: Installation
LTPH-UM-1261-01 2-3
Required Tools
The following tools are required to install the shelf:
• Grounding or ESD-preventive wrist strap
• #2 Phillips-head screwdriver
• #1 Phillips-head screwdriver
• Straight-slot-head screwdriver
• Cable preparation tools
•A
5
/
16
-inch open-end wrench
• Tape measure
• Wire strippers
• An Amphenol crimping tool for making up connectors (if necessary).
Notes:
Note: All other tools are normally carried in a craftsman’s tool set.